| Previous. All pages. Next. Page 1. Page 2. Page 3
|
Thu Dec 23, 2004 Flow-Through Private Placement Closes Cypress Development Corp (the Company) announces that it has closed its non-brokered flow-through unit private placement announced by news release dated November 19, 2004. The Company issued 3,000,000 flow-through units at a price of $0.10 per unit. Each flow-through unit consists of one flow-through share and one non-flow through share purchase warrant which entitles the holder to purchase an additional non-flow through share of the Company at a price of $0.12 until December 21, 2005. In additi... (1 KB) |
|
Fri Dec 17, 2004 Cypress Updates Exploration On Scorpion and Gunman Projects, Nevada Scorpion Gold Project, Nevada:
Cypress Development Corp. (the Company) has now completed an initial surface rock-sampling program on its recently acquired Scorpion gold prospect located in the Walker Lane gold belt in western Nevada. The project is an epithermal style alteration/mineralization with 3 miles of strike length. 52 samples of the local float vein material were collected. The vein textures are excellent, showing banding and calcite replacement. Sulphide is visible in some sa... (2 KB) |
|
Wed Nov 24, 2004 Correction to Flow-Through Private Placement The Company announces a correction to its news release dated November 19, 2004. The Company's 3,000,000 Flow-Through Units at a price of $0.10 per unit will consist of one flow-through share and one share purchase warrant entitling the holder to purchase a non-flow-through share at a price of $0.12 for a period of one year.
Cypress Development Corp. is a diversified precious and base metal exploration and development company with a gold property in Red Lake, Ontario Canada, and 2 gold proper... (1 KB) |
|
Fri Nov 19, 2004 Non-Brokered Private Placement Announced Non-Brokered Private Placement of 3,000,000 Flow-Through Units and 3,000,000 Non-Flow-Through Units
The Board Of Directors of Cypress Development Corp. (the "Company") wish to announce a non-brokered private placement of up to 3,000,000 flow-through units (the "flow-through units") at a price of $0.10 per flow-through unit. Each flow-through unit will consist of one flow-through share (the "flow-through share") and one share purchase warrant entitling the holder to purchase an addition... (2 KB) |
|
Thu Nov 18, 2004 Cypress Development Stakes Awake (Previously Sleeper) Gold Claims Block, Northern Nevada Cypress Development Corp. is pleased to announce that the Company has acquired, by staking, 24 mineral lode claims located in the Slumbering Hills area of Humboldt County, northern Nevada. The Sleeper gold property is situated approximately 5 miles to the south of the Sleeper Mine, which is a well documented prolific past gold producer at the northern extension of the Battle Mountain - Cortez Geological Trend. Active mining was conducted at the Sleeper Mine until the end of 1997, and was operate... (2 KB) |
|
Fri Nov 12, 2004 Cypress Acquires Scorpion Gold Project, Nevada Cypress Development Corp. -TSX.V: CYP- (the Company) announces it has acquired by staking, 26 federal gold lode mining claims in central Mineral County, Nevada. The Scorpion property lies within the widely mineralized Walker Lane structural zone.
The region is noted for its bonanza grade, volcanic hosted precious metal deposits such as the Comstock, Paradise Peak, Goldfield, Aurora, and the Borealis. Active exploration along an east-west trending structural zone that contains the newly stake... (2 KB) |
|
Wed Nov 3, 2004 Drilling Planned In Red Lake, Ontario, Cypress Awaits Assays From Nevada Drilling Planned On McKenzie Island Property, Red Lake, Ontario Cypress Awaits Assays From Gunman Project, Nevada
Cypress Development Corp. (the Company) announces that the operator of its McKenzie Island property, Skyharbour Resources, intends to continue with a drill program on the Company's 5,100 acres McKenzie Island property jointly held by Cypress Development Corp. (CYP 80%) and Skyharbour (SYH 20%).
The companies acquired an additional 250 acres (the Patrie Block, May 2004) ... (2 KB) |
|
Wed Sep 29, 2004 Commencement of Phase 2 / 2004 Work Program, Gunman Project, Nevada Cypress Development Corp. reports that the Company has commenced a Phase 2 work program on its Gunman project located in White Pine county, northeastern Nevada. A detailed geochemical sampling program is being undertaken on the Gunman Property, to cover a strike length of approximately 1.5 kilometers that extends to the south of the known high-grade zinc/silver RH and RH South Zones that have been previously reported. The goal of this soil-sampling program would be to further define and upgrade ... (2 KB) |
|
Wed Sep 1, 2004 Second Quarter Report Ended June 30, 2004 MANAGEMENT DISCUSSION AND ANALYSIS
SIX MONTHS ENDED - JUNE 30, 2004
This Management Discussion and Analysis of Cypress Development Corp. (the "Company") provides analysis of the Company's financial results for the six-month period ended June 30, 2004. The following information should be read in conjunction with the accompanying unaudited financial statements and the notes to the financial statements.
1.1 Date of Report August 25, 2004
1.2 Overall Perf... (2 KB) |
|
Thu Aug 5, 2004 Gunman Phase I Results and Phase II Recommendations Geo. Report Filed Gunman Project 2004 Phase I Exploration Results and Phase II Recommendations
Geological Report Filed on Sedar
Cypress Development Corp. (the "Company") announces that it has commissioned a geological report (the "Report") on its Gunman Project located in White Pine County, North-East Nevada consisting of 120 contiguous, unpatented and unsurveyed Federal lode claims which are under lease (the "Property").
The Report on the Property, entitled "Gunman Project 2004 Phase I Explorati... (2 KB) |
Previous. All pages. Next. Page 1. Page 2. Page 3 |